AIA Virginia offers G702, G703, G704, G706A, G707, and G732. To place an order, simply download, print, complete, and email the documents order form to Keesha Ezell, kezell@aiava.org.

For all other documents, please visit AIA at https://shop.aiacontracts.com/

AIA members receive a 25% discount on paper contract document prices.

G-Series: Contract Administration and Project Management Forms

G702–1992, Application and Certificate for Payment

AIA Documents G702™–1992, Application and Certificate for Payment, and G703™–1992, Continuation Sheet, provide convenient and complete forms on which the contractor can apply for payment and the architect can certify that payment is due. The forms require the contractor to show the status of the contract sum to date, including the total dollar amount of the work completed and stored to date, the amount of retainage (if any), the total of previous payments, a summary of change orders, and the amount of current payment requested. AIA Document G703–1992 breaks the contract sum into portions of the work in accordance with a schedule of values prepared by the contractor as required by the general conditions. (NOTE: The AIA does not publish a standard schedule of values form.)

AIA Document G702–1992 serves as both the contractor’s application and the architect’s certification. Its use can expedite payment and reduce the possibility of error. If the application is properly completed and acceptable to the architect, the architect’s signature certifies to the owner that a payment in the amount indicated is due to the contractor. The form also allows the architect to certify an amount different than the amount applied for, with explanation provided by the architect.

G703–1992, Continuation Sheet

AIA Documents G702™–1992, Application and Certificate for Payment, and G703™–1992, Continuation Sheet, provide convenient and complete forms on which the contractor can apply for payment and the architect can certify that payment is due. The forms require the contractor to show the status of the contract sum to date, including the total dollar amount of the work completed and stored to date, the amount of retainage (if any), the total of previous payments, a summary of change orders, and the amount of current payment requested. AIA Document G703–1992 breaks the contract sum into portions of the work in accordance with a schedule of values prepared by the contractor as required by the general conditions. NOTE: The AIA does not publish a standard schedule of values form.

G704–2000, Certificate of Substantial Completion

AIA Document G704™–2000 is a standard form for recording the date of substantial completion of the work or a designated portion thereof. The contractor prepares a list of items to be completed or corrected, and the architect verifies and amends this list. If the architect finds that the work is substantially complete, the form is prepared for acceptance by the contractor and the owner, and the list of items to be completed or corrected is attached. In AIA Document G704–2000, the parties agree on the time allowed for completion or correction of the items, the date when the owner will occupy the work or designated portion thereof, and a description of responsibilities for maintenance, heat, utilities and insurance.

G706A–1994, Contractor’s Affidavit of Release of Liens

AIA Document G706A™–1994 supports AIA Document G706™–1994 in the event that the owner requires a sworn statement of the contractor stating that all releases or waivers of liens have been received. In such event, it is normal for the contractor to submit AIA Documents G706–1994 and G706A–1994 along with attached releases or waivers of liens for the contractor, all subcontractors, and others who may have lien rights against the owner’s property. The contractor is required to list any exceptions to the sworn statement provided in G706A–1994, and may be required to furnish to the owner a lien bond or indemnity bond to protect the owner with respect to such exceptions.

G707–1994, Consent of Surety to Final Payment

AIA Document G707™–1994 is intended for use as a companion to AIA Document G706™–1994, Contractor’s Affidavit of Payment of Debts and Claims, on construction projects where the contractor is required to furnish a bond. By obtaining the surety’s approval of final payment to the contractor and its agreement that final payment will not relieve the surety of any of its obligations, the owner may preserve its rights under the bond.

G732–2009 (formerly G702CMa–1992), Application and Certificate for Payment, Construction Manager as Adviser Edition

AIA Document G732™–2009 serves the same purposes as AIA Document G702™–1992. The standard form AIA Document G703™–1992, Continuation Sheet, is appropriate for use with G732–2009. NOTE: G732–2009 replaces AIA Document G702™CMa–1992, which expires on December 31, 2010.